CRM for architects: fee proposals, phase billing and approvals
How a small architecture practice should win projects, set fees by phase, get drawings approved and handle changes in writing in 2026, with what the tools cost.
On this page
A small architecture practice needs a CRM that turns an inquiry into a fee proposal quickly, bills each design phase as it's completed, records the client's approval of drawings, and keeps every change in writing before work starts. Practice management tools such as Monograph, BQE Core and Deltek Ajera add time and fee tracking by phase. A lighter client tool covers proposals, contracts, phase billing and approvals for a sole practitioner or a firm of a few people.
Most architecture firms are small
There are more than 19,000 architecture firms in the US, and about 75% have fewer than 10 employees, according to the American Institute of Architects' 2024 Firm Survey: 28% are sole practitioners, 32% have two to four employees and 15% have five to nine. The same report found that billings at smaller firms fell by half between 2015 and 2023, as larger firms took a growing share.
The Bureau of Labor Statistics counted 124,600 architects in 2025, with a median pay of $99,280 and 4% growth expected over the next decade; 14% are self-employed (BLS).
For a small firm, the margin is in the admin. Every hour spent rewriting a fee proposal or chasing a phase payment is an hour not spent on design, and small firms can't hand it to an operations team.
How architects set fees
There are three common approaches, often mixed on one project. Practice software company Monograph describes them in its guide to architectural fees:
- Hourly. Billed for every hour worked, usually invoiced monthly, and common for construction administration, "where there tend to be too many unknowns".
- Fixed fee. A set price per phase. Monograph advises against "settling on a fixed-fee until you and the client have a tightly defined scope".
- Percentage of construction cost. The fee follows the building cost. Monograph notes that design-bid-build fees "tend to be 5-20% of the overall project budget, not just construction costs".
A common hybrid, which Monograph suggests, is a fixed fee for the design phases (concept, schematic design, design development and construction documents) and hourly billing for construction administration. Each phase then becomes its own invoice when it's complete.
Changes, in writing, every time
Changes are where architecture fees leak. A client asks for a bigger kitchen in a site meeting, the drawings get reworked, and the extra fee is never agreed. The American Institute of Architects' guidance on changes and change orders is direct: "Do not issue any change orders until the client approves them in writing." It also reminds architects that on the construction contract, only the client and the contractor can approve changes, and that the architect shouldn't make cost or schedule changes "without the client's prior knowledge and express written consent".
The same discipline applies to your own fee. When the client asks for something outside the agreed scope, price it, send it, and wait for written acceptance before you draw a line. Our guide to change orders in writing has a template.
Writing a fee proposal clients say yes to
A fee proposal is often the first document a client reads from you, and many are long, dense and hard to compare. A clearer structure wins more work:
- Open with the client's project in their words. The site, what they want, the budget and the timeline, so they know you listened.
- Show the phases as a simple list. Each with what you'll deliver, how long it takes and its fee.
- Offer options. Full service, design only, or design with a lighter construction stage. Clients like choosing between two or three clear options more than accepting or rejecting one number.
- Name what's not included. Surveys, engineering, planning fees and specialist consultants, so nobody is surprised later.
- Make accepting easy. One page to accept, sign and pay the first payment, instead of a PDF to print, sign and scan.
A proposal built this way is also faster to write, because the phases and exclusions come from a saved template and only the project details change.
What a CRM should do for an architecture practice
- Qualify inquiries early. Project type, site location, budget range, timeline and whether the client owns the site yet.
- Fee proposals with phases. Concept, schematic design, design development, construction documents and construction administration, each with its fee and what it includes.
- A contract with the key terms. Scope by phase, the number of design options and revisions in each phase, additional services, payment terms, ownership of drawings, limitation of liability and termination.
- Phase billing. Each phase invoiced when it's complete, or a deposit up front and the rest split by phase.
- Drawing approvals on the record. The client approves each phase's drawings, and the approval is kept with the file.
- Large files without a file-sharing service. Drawing sets, renders and models are big, and clients need them in one place.
What practice tools cost in 2026
Prices checked on 18 November 2026.
| Tool | Built for | Price |
|---|---|---|
| Monograph | Project, time and fee management for architects | $45 to $490 a month, depending on firm size |
| BQE Core | Time, billing and project accounting | Quote only; priced per user |
| Deltek Ajera | Accounting and project management for A/E firms | Demo and quote only |
| HoneyBook | Proposals, contracts, invoices | $29 a month billed yearly |
| Harvest | Time tracking | Free for 1 seat and 2 projects; from $9 a seat a month billed yearly |
If you bill most work hourly and need to see fees burned against each phase, a practice tool like Monograph earns its place. If you're a sole practitioner or a small firm selling fixed fees by phase, a client tool for proposals, contracts, phase billing and approvals, plus a time tracker for the hourly parts, can be enough. Our guide to milestone payment schedules covers phase billing in more detail.
How Delivvo fits a small architecture practice
Delivvo runs the client side of a project, from the first inquiry to the last phase invoice, with 0% taken from what your clients pay. It has no time tracker, so hourly construction administration is tracked in a tool like Harvest and billed as invoice lines.
- Inquiries that ask about the project. Your inquiry form collects the project type, site, budget and timeline. Each inquiry lands on your lead board with where it came from.
- Fee proposals by phase. List your packages, such as full service or design only, with add-ons for extra design options, interior design or site visits. The client picks, signs and pays the first payment on one page.
- A contract built from your answers. The contract builder fills in the payment model, milestones, a late payment fee, ownership on payment, limitation of liability, termination with notice and dispute resolution. Add your phase descriptions and additional services in your own words.
- A payment schedule by phase. Split the fee into up to 12 payments, one per phase or stage, each invoiced on its date with reminders. The final invoice takes off what was already paid.
- Approvals on the drawings. Upload each phase's drawings and renders to the client's portal. The client approves them or asks for changes on that version, and every round is kept with its comments.
- Large files in one place. Send drawing sets and renders up to 50 GB a file on Pro, and uploads pick up where they stopped if the connection drops.
Free covers 3 active clients and Solo is $12 a month for 15. Team is $59 a month with 3 people for a small studio. See Delivvo for architects and payment schedules.
FAQ
What is the best CRM for a small architecture firm?
For time and fee tracking by phase, practice tools such as Monograph, BQE Core or Deltek Ajera fit. For proposals, contracts, phase billing and approvals in a sole practice or small firm, a lighter client tool plus a time tracker is often enough.
How do architects charge fees?
Hourly, as a fixed fee per phase, or as a percentage of construction cost. Many combine a fixed fee for the design phases with hourly billing for construction administration.
How should architects bill by phase?
Invoice each phase when it's complete, or take a deposit and split the rest into payments by phase, each with its own due date.
How do architects handle changes to the scope?
Price the change, send it in writing, and wait for the client's written approval before doing the work. The AIA's guidance is not to issue change orders until the client approves them in writing.
Can clients approve drawings online?
Yes. A client portal lets the client approve each phase's drawings or ask for changes on a specific version, and keeps the approval on the record.
Delivvo runs the whole client cycle for service businesses, from the first inquiry to the quote, contract, deposit, invoice and delivery, so every phase is approved in writing and billed when it's done. Clients pay you directly through your own processor, and Delivvo takes 0%. Start free